Designers' guide to Eurocode 1 : actions on buildings : EN1991-1-1 and -1-3 to -1-7 /
The design process of a bridge includes several steps. One of the major steps is the determination of actions & combinations of actions. These actions are imposed loads due to traffic climatic actions, actions due to water or soil subsidence construction loads & accidental actions.
Saved in:
Main Author: | |
---|---|
Corporate Authors: | , |
Other Authors: | , |
Format: | Electronic eBook |
Language: | English |
Published: |
London :
Thomas Telford,
2009.
|
Series: | Designers' guides to the eurocodes.
|
Subjects: | |
Online Access: |
Full text (Wentworth users only) |