The Guri Dam /
Saved in:
Corporate Author: | |
---|---|
Other Authors: | , , , , |
Format: | Electronic eBook |
Language: | English |
Published: |
[Newtown Square, Pa.] :
Project Management Institute,
[2006, 2004]
|
Series: | Case studies in project management.
|
Subjects: | |
Online Access: |
Full text (Wentworth users only) |
Local Note: | Knovel Library Knovel Library |
MARC
LEADER | 00000cam a2200000ui 4500 | ||
---|---|---|---|
001 | w1741858 | ||
005 | 20231013102442.0 | ||
006 | m o d | ||
007 | cr cnu---unuuu | ||
008 | 140325t20062004pauk ob 000 0 eng d | ||
020 | |a 9781628700435 (electronic bk.) | ||
020 | |a 1628700432 (electronic bk.) | ||
020 | |z 1933890312 | ||
020 | |z 9781933890319 | ||
035 | |a (OCoLC)874754378 | ||
040 | |a KNOVL |b eng |e rda |e pn |c KNOVL |d VLB |d OCLCO |d KNOVL |d UtOrBLW | ||
043 | |a s-ve--- | ||
049 | |a WENN | ||
050 | 4 | |a HD69.P75 |b C3378 2006eb | |
082 | 0 | 4 | |a 658.404 |2 23 |
245 | 0 | 4 | |a The Guri Dam / |c Frank T. Anbari ... [and others]. ; edited by Frank T. Anbari. |
264 | 1 | |a [Newtown Square, Pa.] : |b Project Management Institute, |c [2006, 2004] | |
264 | 4 | |c ©2004 | |
300 | |a 1 online resource (20 pages) : |b forms. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
490 | 1 | |a Project Management Institute. Case studies in project management | |
500 | |a Cover title. | ||
500 | |a Additional authors: Sigit Dwiharto, Kamran Givpoor, Chandana Nandyala, Erica C. Perez G. | ||
500 | |a "This case study was originally prepared as part of Project Management Applications, the capstone course of the Master of Science in Project Management at The George Washington University ... This case study was adapted to make it a learning resource and it may not reflect all historical facts related to this project." | ||
504 | |a Includes bibliographical references. | ||
505 | 0 | |a Introduction -- The inception phase -- The development phase -- The implementation phase -- The closeout phase -- Summary of project assessment and analysis -- References -- Teaching note. | |
588 | |a Description based on print version record. | ||
590 | |a Knovel Library |b ACADEMIC - Industrial Engineering & Operations Management | ||
590 | |a Knovel Library |b ACADEMIC - General Engineering & Project Administration | ||
650 | 0 | |a Project management |v Case studies. |0 sh2010108615 | |
650 | 0 | |a Project management |x Study and teaching. |0 sh 85065919 | |
650 | 0 | |a Dams |z Venezuela |x Design and construction. |0 sh2006005931 | |
650 | 0 | |a Construction projects |z Venezuela. |0 sh2006009037 | |
651 | 0 | |a Guri Dam (Venezuela) |0 sh2006005357 | |
655 | 4 | |a Electronic books. | |
700 | 1 | |a Anbari, Frank T. |0 n 2004102351 | |
700 | 1 | |a Dwiharto, Sigit. | |
700 | 1 | |a Givpoor, Kamran. | |
700 | 1 | |a Nandyala, Chandana. | |
700 | 1 | |a Perez G., Erica C. | |
710 | 2 | |a Knovel (Firm) |0 nr2001027264 | |
776 | 0 | 8 | |i Print version: |t Guri Dam. |d [Newtown Square, Pa.] : Project Management Institute, [2006, c2004] |z 1933890312 |w (OCoLC)247065583 |
830 | 0 | |a Case studies in project management. |0 no2007046611 | |
951 | |a 1741858 | ||
999 | f | f | |i 70fa560d-db68-5def-9560-262cdda48ec6 |s c6d1d66b-665b-565e-8122-7b8f8b1ca741 |t 0 |
952 | f | f | |a Wentworth Institute of Technology |b Main Campus |c Wentworth Library |d Ebooks |t 0 |e Knovel |h Other scheme |
856 | 4 | 0 | |t 0 |u https://ezproxywit.flo.org/login?qurl=https://app.knovel.com/hotlink/toc/id:kpCSPMTGD1/case-studies-in |y Full text (Wentworth users only) |