Six sigma demystified

Saved in:
Bibliographic Details
Main Author: Keller, Paul A. (Paul Andrew) (Author)
Format: Electronic eBook
Language:English
Published: New York, N.Y. : McGraw-Hill Education LLC., c2011.
Edition:2nd ed.
Series:Demystified series.
Subjects:
Online Access: Full text (Wentworth users only)

MARC

LEADER 00000nam a2200000 a 4500
001 in00000422742
005 20240918153604.6
006 m|||||||||||||||||
007 cr||n||||||||n
008 150120s2011||||nyu|||||s|||||||||||eng||
010 |a 201029966 
020 |a 9780071746793 (print ISBN) 
020 |a 007174679X (print ISBN) 
020 |a 9780071760829 (eISBN) 
020 |a 0071760822 (eISBN) 
035 |a scn00100125 
050 4 |a TS156   |b .K41 2011 
082 0 4 |a 658.4/013   |2 23 
100 1 |a Keller, Paul A.   |q (Paul Andrew),   |e author. 
245 1 0 |a Six sigma demystified   |h [electronic resource] /   |c by Paul Keller. 
250 |a 2nd ed. 
260 |a New York, N.Y. :   |b McGraw-Hill Education LLC.,   |c c2011. 
300 |a xiv, 510 p. :   |b ill., figs., tables. 
490 1 |a Demystified series 
504 |a Includes bibliographical references and indexes. 
505 0 |a A. Demystified series -- B. Dedication -- C. About the author -- D. Introduction -- How to use this book -- A. Part 1: preparing for deployment -- 1. Deployment strategy -- What is six sigma? -- Differences between six sigma and total quality management (tqm) -- Six sigma and lean -- Elements of a successful deployment -- Chapter 1 quiz -- 2. Developing the training and deployment plan -- Training needs analysis -- Executive overview training -- Champions -- Black belts -- Green belts -- Chapter 2 quiz -- 3. Focusing the deployment -- Customer focus -- Project selection -- Chapter 3 quiz -- B. Part 2: dmaic methodology -- 4. Define stage -- Objectives -- Project definition -- Top-level process definition -- Team formation -- Recommended tools -- Chapter 4 quiz -- 5. Measure stage -- Objectives -- Process definition -- Metric definition -- Process baseline estimation -- Measurement systems analysis -- Recommended tools -- Chapter 5 quiz -- 6. Analyze stage -- Objectives -- Value-stream analysis -- Analyzing sources of variation -- Determining process drivers -- Recommended tools -- Chapter 6 quiz -- 7. Improve stage -- Objectives -- Defining the new process -- Evaluating process failure modes -- Assessing benefits of the proposed solution -- Implementation and verification -- Recommended tools -- Chapter 7 quiz -- 8. Control stage -- Objectives -- Standardize on the new methods -- Measure bottom-line impact -- Document lessons learned -- Recommended tools -- Chapter 8 quiz -- C. Part 3: six sigma tools -- 9. Six sigma tools -- Affinity diagrams -- Anova -- Autocorrelation charts -- Box-whisker chart -- C chart -- Cause-and-effect diagram -- Confidence interval on mean -- Confidence interval on proportion -- Contingency tables -- Contour plot -- Control plans -- Design of experiments (doe) -- Distributions -- Equality-of-variance tests -- Evolutionary operation (evop) -- Ewma charts -- Factorial designs -- Failure modes and effects analysis (fmea) -- 5 s -- Flowchart -- Gantt chart -- Goodness-of-fit tests -- Histogram -- Hypothesis testing -- Individual-x and moving-range charts -- Interaction plots -- Lean methodology -- Level loading -- Linearity analysis -- Matrix diagrams -- Multi-vari plots -- Nominal group technique -- Nonparametric test on equality of means -- Np chart -- P chart -- Pareto chart -- Pert analysis -- Prioritization matrix -- Process capability index -- Process cycle efficiency -- Process decision program charts -- Process maps -- Process performance indices -- Quality function deployment -- R&r studies -- Regression analysis -- Response surface analysis -- Run-test rules -- Scatter diagrams -- Sipoc -- Spaghetti diagram -- Statistical process control (spc) charts -- Transformation -- U chart -- Velocity -- Work breakdown structure -- X-bar charts -- D. Final exam -- E. Answers to quizzes and final exam -- Chapter 1: deployment strategy -- Chapter 2: developing the training and deployment plan -- Chapter 3: focusing the development -- Chapter 4: define stage -- Chapter 5: measure stage -- Chapter 6: analyze stage -- Chapter 7: improve stage -- Chapter 8: control stage -- Final exam -- F. Appendix 1: area under the standard normal curve -- G. Appendix 2: critical values of the t distribution -- H. Appendix 3: chi-square distribution -- I. Appendix 4: f distribution (? = 1%) -- J. Appendix 5: f distribution (? = 5%) -- K. Appendix 6: control chart constants -- L. Appendix 7: table of d*2values -- M. Appendix 8: capability index to sigma level conversion -- N. Appendix 9: estimating sigma using long-term dpmo (from field data) -- O. Appendix 10: durbin-watson test bounds -- P. Glossary -- Q. References. 
530 |a Also issued in online version. 
588 |a Description based on cover image and table of contents, viewed on Jan. 20, 2015. 
650 0 |a Six sigma (Quality control standard) 
830 0 |a Demystified series. 
852 |b Ebooks  |h Access Engineering 
856 4 0 |u https://ezproxywit.flo.org/login?url=https://www.accessengineeringlibrary.com/content/book/9780071746793  |z Full text (Wentworth users only)  |t 0 
949 |a TS 156 .K41 2011  |w LC  |c 1  |e 100125-1000  |d 01/21/2015  |l MAIN  |m MGH  |q 1  |r Y  |s Y  |t WEB  |u 01/21/2015  |x ENG 
999 f f |i 2903b65b-5435-43d6-af90-94b2d5e9033a  |s 70684b5e-88b9-42a8-a1ad-f4301f2f5f3c  |t 0 
952 f f |a Wentworth Institute of Technology  |b Main Campus  |c Wentworth Library  |d Ebooks  |t 0  |e Access Engineering  |h Other scheme 
856 4 0 |t 0  |u https://ezproxywit.flo.org/login?url=https://www.accessengineeringlibrary.com/content/book/9780071746793  |z Full text (Wentworth users only)